Rainwater Runoff & Recharge Structures Calculator

Hydro Geo Solutions LLP  |  CPWD Rational Method · CGWB / GEC-2015 · IS-15797 · IMD IDF
Climate Parameters  IMD / Site Records
Reference: Intensity values to be read from IMD IDF curves for the project locality and selected return period. Default values are typical for humid Indian conditions; verify against site IDF.
Land Use Distribution  CPWD Rational Method
Sl. Land Use Type Area (m²) Coefficient of Runoff (C) First-flush?
CPWD C-values: Roof 0.85 · Paved 0.65 · Green 0.15 · Open 0.20 · Gravel 0.30 (see Constants tab for full reference). First-flush typically applies to rooftop and paved surfaces (IS-15797).
Storage & Domestic Demand (Optional)
Recycle / reuse parameters and evaporation rates are managed in the Constants tab.
Recharge-Rate Source  CGWB / GEC-2015
Unit Recharge Rate Mode:
Use when site infiltration / pump-in test data is available directly.
Empirical Constants & Design Parameters
References: Clogging factor 0.5–0.7 (CGWB Manual on Artificial Recharge, 2007); first-flush 1–2 mm/event (IS-15797: 2008); operating hours typically 6–12 hr per rainy event; evaporation 1.5–2.5 m/yr semi-arid Indian conditions; recycle recovery 0.60–0.70 for greywater treatment (kitchen + flushing reuse).
CPWD Runoff-Coefficient Reference Table
Sl.Surface TypeC (Coefficient of Runoff)First-flush typically applied?
1Roof / terrace (RCC, GI sheet)0.85Yes
2Paved area (concrete, bitumen, paver-block)0.65Yes
3Gravel / kankar0.30No
4Open / unpaved / lawn (compacted)0.20No
5Green / landscaped (well-drained)0.15No
Source: CPWD Plumbing Manual (Rainwater Drainage, Chapter 9) and IS-15797 first-flush guidance.
GEC-2015 / NAQUIM Aquifer Parameter Reference
Sl.Principal Aquifer / FormationK (m/day)Sy (%)
Source: GEC-2015 (CGWB), NAQUIM aquifer reports, with cross-reference to Domenico & Schwartz (1998) and FAO Irrigation & Drainage Paper 64. Values are representative; site-specific verification through pump-test interpretation is recommended for design.
Select Structure Type & Dimensions
Per-Structure Capacity (computed)

Recommendation — Number of Structures (Back-Calculated)

Sl. Sizing Basis Demand Capacity per Structure No. of Structures Required Basis / Formula
Total Catchment Area
Net Annual Runoff
m³/yr
Design-Event Peak Runoff
Recommended Structures
nos.

Table A — Annual Runoff Computation (with First-Flush Deduction)

Sl. No. Land Use Type Area (m²) C Annual P (m) Gross Runoff (m³/yr) First-flush Loss (m³/yr) Net Annual Runoff (m³/yr)

Table B — Peak Runoff at Multiple Durations (IDF-based)

Sl. No. Land Use Type Area (m²) C 15-min Q (m³) 30-min Q (m³) 60-min Q (m³)

Table D — Annual Saving / Recharge Summary

Sl. No. Component Volume (m³/yr) Volume (KL/yr) Remarks